Page 29 - navstrat
P. 29
NAVSTRAT-2030
Table 1.3
The Present SLN Fleet
Vessel/Craft Actual in 2023
Frigates -
OPVs 08
FMVs 02
FGB/CPV 11
FPC 02
FAC 49
P Aux 01
LST 01
LCM 02
LCU 02
IPCs 63
Table 1.4
The Present SLCG Fleet
Vessel/Craft Actual in 2023
OPV 02
FPV 02
FPB 10
IPC 10
The following aspects were considered as the pillars in the direction for planning, developing,
and delivering current and future capabilities of the future Navy 2025;
Professionalism
Operational versatility
Interoperability
Deployable
Information focused
Agility
The right expansion
Asymmetric warfare
Following are the key facts that were expected to be focused prior to developing the ‘A Twenty
Ship Navy 2025;
Influence events at a distance
Freedom of the seas
Joint enabler
Wide range of operations
Versatile and combat-capable
Collaboration
Interoperability
16